Bosch DHD905AUC Specifications Page 3

  • Download
  • Add to my manuals
  • Print
  • Page
    / 16
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 2
3
English Français Español
3. Place the plastic template against the back flange of the
cooktop and center it. Trace around template to mark the
downdraft opening.
4. Remove cooktop from countertop.
5. Cut downdraft opening. Be careful not to chip edges of
countertop.
MOUNT THE UNIT
CUT COUNTERTOP OPENING
1. Lay out and cut the cooktop cut-out far enough FORWARD so
downdraft will fit behind it.
2. Set cooktop in place and slide it as far forward as possible.
Center and square it with edges of countertop.
INSTALL DUCTWORK
1. Set downdraft into opening. Extend leveling brackets to floor
of cabinet so downdraft sits straight. (Note: Leveling brackets
can be removed and re-attached in other positions. Bottom
flange may have to face inward in tight cabinet installations.)
2. Secure the downdraft to the countertop as follows: Hold the
downdraft against the back of countertop cut-out and tighten-
ing the 2 mounting screws (one on each end of unit) on
underside of countertop. Use a wood shim between screw and
underside of granite countertops.
3. Screw leveling brackets to bottom of cabinet. Tighten screws
holding leveling bracket to unit on each side.
CAUTION - BEFORE CUTTING HOLE IN CABINET FOR DUCT-
WORK: Check for interference with floor joists, wall studs, electri-
cal wiring or plumbing.
ELBOW
ELBOW
1. Cut hole in cabinet as well as holes in wall or floor as
necessary.
2. Mount the exterior blower and work back towards the cabinet,
attaching all ductwork, elbows and transitions as previously
planned. Tape all ductwork connections to make them secure
and air tight.
3. Connect ductwork to downdraft. If necessary, LOOSEN nuts
and screws that hold remote blower adapter plate in place, and
slide outlet assembly left or right to meet ductwork. Re-tighten
screws and nuts.
INSTALL ELECTRICAL WIRING
1. Mount a standard wiring box, with 3-pronged grounded recep-
tacle, inside the kitchen cabinet. Make sure the unit's power
cord can easily reach it.
2. Run appropriate power cable into cabinet and connect it to
electrical box and receptacle.
3. Exterior blower may not exceed 6.0 Amp rating.
4. Run 2-wire plus ground power cable from the remote blower
to wiring box on remote blower adapter plate.
5. Connect downdraft wiring to power cable from remote blower.
Wire black to black, white to white and green to green or bare
wire.
6. Replace wiring box cover.
7. Plug the downdraft's power cord into outlet.
LEVELING BRACKET -
FLANGE FACING IN
LEVELING BRACKET -
FLANGE FACING OUT
MOUNTING SCREWS
10" ROUND
DUCT
Page view 2
1 2 3 4 5 6 7 8 ... 15 16

Comments to this Manuals

No comments