11 Notes on Service and Maintenance
11.1 Maintenance Work to be Carried Out
Perform the following maintenance work:
On the video system itself:
check that all cables are connected firmly
check the fans and clean if necessary
clean the screen if dirty
check the system time and set if necessary
Check the quality of the last five saved images per camera (e.g. sharpness, brightness,
contrast).
The images stored in the archives must be randomly checked (with regard to image
quality and additional data)
At least one trigger by a connected AP or a directly connected contact must be
undertaken. The images placed in the archives as a result of this action must be checked
and then deleted.
The hard disk load must be checked. In agreement with the customer, it may be
necessary to delete images.
All freely accessible cameras and lenses as well as dome cameras and front screens of
external cameras should be cleaned. While doing so, the connecting cables and plugs
must be checked.
The reference images printed or saved during installation of the system must be
compared with the live images of the corresponding cameras with regard to their
alignment. The customer is answerable to the administrative association (BGV) with
regard to setting the image frame size.
A functional test in accordance with UVV Kassen must be carried out at least once per
month. The SP 9.7/7 Requirements for testing of optical room monitoring systems
must be taken into account.
Checking of the customer-owned printer (1 printout).
A test connection is to be set up for the ISDN connection.
For ATM connection:
check the connecting cables on the interface processor and on the OVS
check the transmission of the transaction data
access control data display (check the access control connection cable)
All work carried out is to be documented in the operating handbook.
Maintenance work to be carried out by the operator
The operator must:
replace the toner cartridge for laser printers,
replenish printer paper or the video printer paper cartridge, and
replace the color cartridge for ink jet printers.
NOTICE!
All work on the system that affects recording may only be carried out with the prior agreement
of the customer. For UVV-relevant devices, it is preferable that this work is carried out outside
of counter opening times.
If defective, the system (without dongle) is to be exchanged. A loan device will be made
available by the video system manufacturer during this time.