Bosch DANESMOOR UTILITY 32-50 Instruction Manual Page 23

  • Download
  • Add to my manuals
  • Print
  • Page
    / 52
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 22
Secondary heat exchanger:
1 Unscrew screws (B) and remove flue
manifold access cover (A).
Check that all the baffles and retainer are
correctly fitted to the secondary heat
exchanger:
SLOTS DOUBLE SINGLE
BAFFLES BAFFLES
32/50kW* 25 10 N/A
50/70kW 31 15 1
*Five of the slots do not have baffles.
Combustion chamber:
2 Remove the retaining nuts and washers (D).
Remove combustion chamber access
door (C).
3 Remove the transit packaging and ensure
the baffles (E) and baffle retainer (F) are
correctly fitted for the boiler output as
shown in the plan views below.
4 Refit combustion chamber door (C).
IMPORTANT: Secure with nuts and
washers (D) and tighten gradually in the
sequence (1-6) shown until the chamber
door is firmly secured, do not over tighten
the nuts.
COMBUSTION CHAMBER
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/708 716
109 711B 07.2010
23
INSTALLATION
COMBUSTION CHAMBER
FRONT FRONT
8 716 109 711 b 07.10 14/7/10 09:59 Page 23
Page view 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 51 52

Comments to this Manuals

No comments