Bosch 4036 User Manual

Browse online or download User Manual for Dishwashers Bosch 4036. Bosch Inline Pump, John Deere, drive hub pin timed Applications

  • Download
  • Add to my manuals
  • Print
  • Page
    / 6
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Corporate Office: P.O. Box 21121, Eugene, OR 97402
oregonfuelinjection.com
EUGENE MEDFORD
Bosch Inline Pump Removal and Installation
John Deere Applications (pin timed)
Removal
1. Clean injection lines and area around the injection pump with cleaning
solvent or a steam cleaner.
2. Rotate engine flywheel (in normal running direction) until No.1 piston is at
“TDC" (top dead center) compression stroke. At this point, John Deere
JOE81-4 timing pin should enter hole in flywheel.
IMPORTANT: Never steam clean or pour cold water on an Injection pump while
the pump is running or while it is warm. To do so may cause damage to the
injection pump.
3. Remove injection pump drive gear cover and O-ring.
4. Install JDG886 Injection Pump Timing Pin (A) through injection pump drive
gear into injection pump hub until it bottoms. In some instances, it may be
necessary to rotate the pump drive hub slightly to get the pin installed.
4036 West 1
st
Ave.
Eugene, OR 97402
(541) 485-1434 • 1-800-452-5055
2221 Tower East Dr
Medford, OR 97504
(541) 773-8669 • 1-800-648-8848
10/10/12
Oregon Fuel Injection
Page view 0
1 2 3 4 5 6

Summary of Contents

Page 1 - Oregon Fuel Injection

Corporate Office: P.O. Box 21121, Eugene, OR 97402 oregonfuelinjection.com EUGENE MEDFORD Bosch Inline Pump Removal and Installation John Deere

Page 2

Corporate Office: P.O. Box 21121, Eugene, OR 97402 oregonfuelinjection.com EUGENE MEDFORD 5. Disconnect injection pump lube line (B). 6. Disc

Page 3

Corporate Office: P.O. Box 21121, Eugene, OR 97402 oregonfuelinjection.com EUGENE MEDFORD 2. Rotate injection pump drive hub until marks on dri

Page 4

Corporate Office: P.O. Box 21121, Eugene, OR 97402 oregonfuelinjection.com EUGENE MEDFORD 8. Install drive gear-to-pump hub cap screws (B) and

Page 5

Corporate Office: P.O. Box 21121, Eugene, OR 97402 oregonfuelinjection.com EUGENE MEDFORD 12. Connect aneroid line (G). 13. Connect fuel suppl

Page 6

Corporate Office: P.O. Box 21121, Eugene, OR 97402 oregonfuelinjection.com EUGENE MEDFORD Priming and Starting 1. Loosen fuel return line (

Comments to this Manuals

No comments