Bosch AMC2 ENC-UL1 - Enclosure - Small User Manual Page 8

  • Download
  • Add to my manuals
  • Print
  • Page
    / 88
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 7
8 en AEC-AMC2-UL1 - Installation manual
F.01U.097.252 | V 3.2 | 2010.01 Bosch Sicherheitssysteme GmbH
Connection of the Devices
Figure 4 Connection of the devices
1. Mount the AMC on the rail (item 2 in Figure 1) and left
aside the power supply.
2. Put the rechargeable batteries on the bottom of the
housing and secure them with the cable ties F - (Figure 2).
3. Stick the bracket J (Figure 2) on the back of the housing in
such a way that later on not used connectors of the cable
B can fixed with it.
4. Cable set A:
a. Connect the 7-pin plug A1 to the AMC’s power supply
connector (labeled: POWER).
b. Attach connectors A3 to the PS-interface DC and A2
to the interface labeled OK.
c. Connect the grounding cable A4 beneath the
grounding point 3.
5. Cable set B:
i
NOTICE!
The following steps describe connecting the rechargeable
batteries in 24 V mode. For information on 12 V mode
connections, refer to Section 12 V Mode Variations, page 11.
Page view 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 87 88

Comments to this Manuals

No comments