3
INITIAL PREPARATIONS
Determine the operating voltage at the
installation site. The camera‘s Voltage
Regulator Board accepts either +12V dc or
24V ac input.
See Section 2, Input Power Connections.
Determine the optimum location for the
camera. Section 3, Mounting-Camera Base.
All cameras have been tested prior to
shipment. After the wiring has been
reconnected, it is advisable to check the
camera’s operation before installation.
ESD protection – Cameras and circuit boards
are sensitive electronic components. It is
recommended to wear a ground strap to
ground any static charge. (Alternative: touch a
grounded metal plate for at least a minute
before proceeding with any disassembly)
GUIDELINES
The installation of the EX49N camera is explained
in Sections 1 to 5 listed below. It is important that
these steps are followed in sequence:
1. Dome Removal
2. Input Power Connections
3. Mounting – Camera Base
4. Camera /LED Adjustments
5. Camera Re-Assembly
Comments to this Manuals