Bosch Power Xpress Installation Guide Page 20

  • Download
  • Add to my manuals
  • Print
  • Page
    / 26
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 19
20
Power Xpress™ Bollard Charge Station
Installation Guide
EL-50600-17 Rev. A
27. Carefully lower the upper plastic cover down
onto the bollard base.
A
B
A. Upper plastic cover
B. Metal bollard
Figure 29. Upper Bollard Lowered into Place
28. Use a small at-blade screwdriver or similar
tool to guide the upper plastic cover into the
seal.
WARNING:
WARNING:
RED STATUS LIGHT ILLUMINATED - SEE OPERATING MANUAL FOR
FAULT INDICATION AND OPERATING INSTRUCTIONS.
8.RETURN CABLE AND COUPLER BACK TO STOWABLE POSITION AT EVSE.
NOTE: EVSE WILL RESUME CHARGING UPON RESTORATION OF INTERRUPTED GRID POWER.
7.UNPLUG VEHICLE COUPLER (CONNECTOR) FROM VEHICLE INLET (RECEPTACLE) - STATUS
INDICATOR CHANGES BACK TO AMBER ILLUMINATION STATE.
6.POST COMPLETION OF CHARG - STATUS LIGHT RETURNS TO SOLID GREEN ILLUMINATION
STATUS.
5.AFTER SAFETY TEST VERIFICATION - STATUS LIGHT BEGINS TO FLASH GREEN, INDICATING
VEHICLE IS CHARGING.
LA LUMIERE DE STATUT ROUGE ECLAIREE - VOIT LE MANUEL
OPERANT POUR L’INDICATION DE FAUTE ET LES
INSTRUCTIONS OPERANTES.
Sl appareil ne fonctionne pas selon les instructions
EMPLOI Ne pas utiliser ce peripherlque, contactez
TECHNICIEN QUALIFIE pour entretien ou reparation.
IF UNIT FAILS TO OPERATE PER THE OPERATING INSTRUCTIONS DO NOT USE
THIS DEVICE, CONTACT QUALIFIED TECHNICIAN FOR SERVICE OR REPAIR.
AVERTISSEMENT:
AVERTISSEMENT:
FOR USE WIT H ELECTRIC VEHIC LES ONLY
VENTILATION NOT REQUIRED
A
B
C
D
A. Upper plastic cover
B. Seal
C. Lower plastic cover
D. Small at-blade screwdriver
Figure 30. Seal Installation
29. While gently pressing down on the upper
plastic cover, carefully slide the screwdriver
around the bollard to extend the upper lip
of the seal over the upper plastic cover. The
upper cover may need to be tapped gently to
fully seat it in the seal.
CAUTION: Use care not to cut or damage the
seal during this procedure.
NOTE: When the upper plastic bollard cover is fully
seated, the rear cable-management holes
will be in line with the threaded holes in
the steel portion of the bollard base and the
rubber cable grommet will be centrally lo-
cated with respect to the rubber seal.
Verify the cable-management holes and the
rubber cable grommet are each properly
aligned.
30. Use a 5/16-in. hex-head wrench to install the
rear cable-management hook with the two
cable-management retaining screws. The
torque on the cable-management retaining
screws should be 60 ± 5 in-lb (6.8 ± 0.55 Nm).
Page view 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 26

Comments to this Manuals

No comments