Bosch DVA-12T Installation Guide Page 10

  • Download
  • Add to my manuals
  • Print
  • Page
    / 20
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 9
10 en | Power On RAID Subsystem DVA-12T | Quick Installation Guide
F.01U.027.801 | V2 | 2006.07 Bosch Security Systems
8 Power On
To power on the subsystem:
1. Install all the hardware components.
2. Make all the connections described above.
3. Power on the network connecting devices such as the Ethernet switches.
4. Power on the subsystem by turning on both power switches on the rear panel of PSU
modules. For the location of the power switches, please see Figure 7.1.
5. Power on servers or host computers.
9 Configuring the Host Computer via a Network
The first time you use the subsystem you have to set up your computer to access the sub-
system.
To set up the computer:
1. Attach a network cable from the DVA’s Ethernet port (CH1) to a network.
or
Connect the computer with the subsystems’s Ethernet port via a cross-over cable.
2. Access any computer on the network.
3. To access the subsystem simply access a shell or a DOS prompt on your host computer,
and enter the following command:
This procedure allows a connection to the subsystem even if your computer has different
network settings.
i
NOTICE!
If you do not use a cross over cable and connect the unit to a network, your network’s subnet
mask may not allow you to access this IP address without some re-configuration.
Windows route add 192.168.0.100 <workstation IP number>
mask 255.255.255.255
Page view 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 19 20

Comments to this Manuals

No comments