Bosch AE115 User Manual Page 10

  • Download
  • Add to my manuals
  • Print
  • Page
    / 16
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 9
Diagram 4: Internal wiring schematic for single phase AE125 unit. (AE115 does not have Elt 5 & 6 fitted
and uses two supplies). (In Canada an auxiliary terminal block is fitted during installation).
Using the PowerStar
WARNING
Do not use the unit if you think it may be frozen, as this could result in serious damage to the unit. Wait
until you are sure that it has completely thawed out before you switch it on.
Check that the power is switched on at the circuit breaker panel.
Turn on the hot water faucet FULLY. The hot water temperature can be changed by adjusting the
temperature dial on the bottom surface of the unit. (The dial adjusts the temperature typically
between 95°F and 131°F. The factory sets the temperature dial at the lowest position.)
There are internal safety thermal cut-outs which will trip if the unit overheats. If the cut-out trips, it
must be reset while the circuit breakers are off. If you are not comfortable or qualified to perform this
task, consult the original installer or a licensed electrician.
If the unit has been used recently, run the water through for a few seconds to let the temperature
cool down. You may initially get a short burst of very hot water that was in the plumbing lines from
previous use.
If a second outlet connected to the unit is also turned on, the hot water will be shared between the
two.
10
Page view 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 16

Comments to this Manuals

No comments