Bosch GPO 12 E Professional Operations Instructions Page 11

  • Download
  • Add to my manuals
  • Print
  • Page
    / 62
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 10
English - 4
Before any work on the machine itself, pull
the mains plug.
For safe and proper working, always keep
the machine and the ventilation slots clean.
In extreme working conditions, conductive
dust can accumulate in the interior of the
machine when working with metal. The
protective insulation of the machine can be
degraded. The use of a stationary extrac-
tion system is recommended in such cases
as well as frequently blowing out the venti-
lation slots and installing a residual current
device (RCD).
If the machine should fail despite the care taken
in manufacturing and testing procedures, repair
should be carried out by an after-sales service
centre for Bosch power tools.
In all correspondence and spare parts orders,
please always include the 10-digit order number
given on the nameplate of the machine.
WARNING! Important instructions for con-
necting a new 3-pin plug to the 2-wire cable.
The wires in the cable are coloured according to
the following code:
Do not
connect the blue or brown wire to the
earth terminal of the plug.
Important: If for any reason the moulded plug is
removed from the cable of this machine, it must
be disposed of safely.
Recycle raw materials instead of disposing as
waste
The machine, accessories and packaging should
be sorted for environmental-friendly recycling.
These instructions are printed on recycled paper
manufactured without chlorine.
The plastic components are labelled for catego-
rized recycling.
Exploded views and information on spare
parts can be found under:
www.bosch-pt.com
Great Britain
Robert Bosch Ltd. (B.S.C.)
P.O. Box 98
Broadwater Park
North Orbital Road
Denham-Uxbridge
Middlesex UB 9 5HJ
Service............................ +44 (0)18 95 / 83 87 82
Advice line.................... +44 (0) 18 95 / 83 87 91
Fax
............................................. +44 (0) 18 95 / 83 87 89
Ireland
Beaver Distribution Ltd.
Greenhills Road
Tallaght-Dublin 24
Service................................... +353 (0)1 / 414 9400
Fax
.................................................... +353 (0)1 / 459 8030
Australia
Robert Bosch Australia Ltd.
RBAU/SPT2
1555 Centre Road
P.O. Box 66 Clayton
3168 Clayton/Victoria
............................................... +61 (0)1 / 800 804 777
Fax
............................................... +61 (0)1 / 800 819 520
www.bosch.com.au
New Zealand
Robert Bosch Limited
14-16 Constellation Drive
Mairangi Bay
Auckland
New Zealand
..................................................... +64 (0)9 / 47 86 158
Fax
..................................................... +64 (0)9 / 47 82 914
We declare under our sole responsibility that this
product is in conformity with the following stand-
ards or standardization documents: EN 50 144
according to the provisions of the directives
89/336/EEC, 98/37/EC.
Dr. Egbert Schneider Dr. Eckerhard Strötgen
Senior Vice President Head of Product
Engineering Certification
Robert Bosch GmbH, Geschäftsbereich Elektrowerkzeuge
Subject to change without notice
Maintenance and Cleaning
Environmental Protection
strain relief
live = brown
neutral = blue
To be fitted
by qualified
professional only
Service and
Customer Assistance
Declaration of Conformity
1 609 929 392 -Buch Seite 4 Dienstag, 19. August 2003 4:49 16
11 1 609 929 392 TMS 18.08.03
Page view 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 61 62

Comments to this Manuals

No comments