Bosch Bosch 17e Installation Guide Page 10

  • Download
  • Add to my manuals
  • Print
  • Page
    / 12
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 9
ROBERT BOSCH (AUST) - EVERLAST HYDRO SYSTEMS WIRING PLAN PAGE 2 OF 2
APPLICATIONS : Commercial Process, Industrial or Dairy Industry etc. water heating to supply at 90 ºC.
TESTING : The pump will operate until the thermostat set temperature of the Everlast Storage Accumulator is reached. When testing the
thermostat there will be a CLOSED CIRCUIT between 1 and 2 until the thermostat set temperature is reached. This is a 240 V AC series application
without over temperature thermal cut out. This is intended for high water temperature delivery systems. Safety Pressure and Temperature Relief
Valves as specified in AG 102, must be installed into pipework.
Information on troubleshooting is found in the Pump and Gas Heater User Handbooks (provided with this Guide).
240 V AC
SUPPLY
ACTIVE NEUTRAL
RED + BLACK —
GD MAINS
TERMINAL CONNECTOR
EVERLAST HIGH
TEMP C2
THERMOSTAT
EW SERIES
SET UP TO 90 ºC
1
BROWN
2
GRUNDFOS
UPS TYPE
PUMP
WITH PUMP
SHAFT
HORIZONTAL
BLUE
BOSCH CONTINUOUS
FLOW WATER
HEATER OR
MULTIPLES.
MODELS 17E, 21E &
25E REQUIRE 240 V
AC. FOR ELECTRONIC
IGNITION. MAY BE
PROVIDED
THERE IS NO
ELECTRICAL
CONNECTION FROM
THE GAS UNIT TO
CIRCULATING PUMP
240 V AC
SUPPLY
GREEN/YELLOW
EARTH
RED
BOSCH – EVERLAST SCHEMATIC WIRING PLAN
COMBO HIGH TEMP MODEL
PAGE REV : 1
ROBERT BOSCH (AUST) PTY LTD www.bosch.com.au EVERLAST™ HYDRO SYSTEMS PTY LTD. www.everlastwaterheaters.com
Page view 9
1 2 ... 5 6 7 8 9 10 11 12

Comments to this Manuals

No comments