Bosch Bosch 17e Installation Guide Page 11

  • Download
  • Add to my manuals
  • Print
  • Page
    / 12
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 10
C:\Documents and Settings\Matt\My Documents\Business\everlast\content\commerical_315C250_MANUALandWarranty.doc Page 11 of 12 January, 2006 Revision 3
Gas Connections & Gas Piping
The Bosch-Everlast™COMBO Commercial Gas Hot Water System
incorporates Bosch Continuous Flow Water Heaters which are Type
A Appliances in accordance with AG 102. The Bosch Continuous
Flow Water Heaters are produced for connection to Natural Gas and
for connection to Liquified Petroleum Gas (LPG).
The Installation requirements of AG 601 - The Gas Installation
Code, apply to all general work & safety requirements, materials &
gas piping, installation of gas piping, appliance installation and
commissioning.
The Technical Services Division of Robert Bosch Australia provides
a service for Information Support in regard to Gas connection and
piping requirements to the Gas units.
INTEGRATED HEATER MOUNTING ( C2 – 32 mm units
only ) This feature is not available on 50 mm outlet units
A feature of the Bosch-Everlast™COMBO Commercial Gas Hot Water
System is Integrated Heater Mounting located on the side of the
casing. These are secure, load bearing positions for the Continuous
Flow Water Heater. The Integrated Heater Mounting locates the
(optionally supplied) Heater Support Bracket, and is designed to
ensure stable support of the Heater and pipe mounted primary pump
for freestanding design where Systems are externally located. The
attachment points of the Integrated Heater Mounting are stud-fitted
and the Heater Support Bracket is predrilled for correct alignment
using the supplied dome headed nuts. A schematic is shown below.
Simply determine the position of the Bosch Continuous Flow Water
Heater and mount your Heater on the Support Bracket.
Maintenance
Maintenance of the system is limited to the periodic recommended
draining and flushing of the Accumulator in areas of poor water
quality and sediment in water supply. Bosch Continuous Flow Water
Heater maintenance requirements as outlined by the manufacturer
of the Gas unit(s) adopted, should also be complied.
HEATER SUPPORT BRACKET MOUNTING DETAIL :
C2 Accumulator Heater Support Bracket
Outer case
Integrated Bosch Continuous Flow
Heater Heater
Mounting
inside case
Enlarged mount
detail.
Case
Mount Bracket
Supplied fitted stud & dome nut, at each mount
point ensures positive clamping between the Dome Nut / Stud
Integrated Heater Mounting & Heater Support Bracket.
Refer to the Warranty Conditions & Exclusions.
Warranty Conditions
1. The system must be installed by a licensed plumber and/or electrician in
accordance with Bosch Continuous Flow Water Heater manufacturers &
Everlast™ installation instructions; and all relevant statutory and local
requirements of the State in which the system is installed.
2. The Bosch-Everlast™COMBO Commercial Gas Hot Water System must
be operated and maintained in accordance with instructions supplied by
Robert Bosch (Australia) Pty Ltd & Everlast™ Hydro Systems Pty Ltd
3. The Accumulator is warranted to be defect free for a period of 10 years
in domestic installations, and 5 years in commercial installations. This
warranty only applies to the Accumulator product and does not apply to
any additional electrical, gas and/or plumbing parts supplied by the
installer. The Bosch Continuous Flow Water Heaters are warranted as
detailed in the manufacturers handbook.
4. The system is covered for the indicated period from the date of the
original purchase.
5. Should this system be installed in a regional location where regular
flushing is required due to sediment build-up, then a drain cock or tee for
flushing must be fitted at the time of installation. If in doubt consult your
Installation Contractor.
Page view 10
1 2 ... 6 7 8 9 10 11 12

Comments to this Manuals

No comments