Bosch SM070 Specifications Page 21

  • Download
  • Add to my manuals
  • Print
  • Page
    / 100
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 20
Vertical Configurability | 21SM Series Heat Pump
6 720 220 406 (2013/9)Revised 08-13
3. Locate the BACK left condensate drain and
remove and retain plastic plug covering the
cutout. (Figure#65)
Figure # 65
4. Reinstall the removed plastic plugs in the
original Condensate Drain Location.
5. Route the flexible plastic tube from FRONT left
corner post to BACK left. (Figure#66)
Figure # 66
6. Measure and cut the condensate drain hose to
the appropriate length.
7. Insert spring onto condensate drain hose.
8. Reinstall condensate drain plastic fitting and
bushing in its new location.(Figure#67)
Figure # 67
HRP Switch Relocation
The HRP Pump Disconnect Switch is shipped loose
inside unit E-Box, to be connected to either FRONT
right corner post or BACK right corner
post.(Figure#68)
Figure # 68
1. From the inside of the unit remove (2) wires
connected to HRP Pump Disconnect Switch.
Avoid kinking the hose and/or creating a dip
which could act as a second internal p-trap.
Double trapped drain lines will not drain
properly.
Page view 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 ... 99 100

Comments to this Manuals

No comments