Bosch Greenstar 12i Service Manual Page 12

  • Download
  • Add to my manuals
  • Print
  • Page
    / 72
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 11
PRE-INSTALLATION
6 720 644 743b (2011/08)
12
3.2 MAINS SUPPLY
3.2.1 ELECTRICAL SUPPLY
Supply: 230V - 50 Hz, 140 Watts
Cable: PVC insulated 0.75 mm
2
(24 x 0.2 mm)
temperature rated to 90 °C.
External 3A fuse to BS1362.
The appliance must be earthed.
This appliance must not be connected to a three
phase supply.
IPX4D.
Wiring must comply with the latest edition of BS 7671
(IEE wiring regulations).
3.2.2 GAS SUPPLY
Boilers using Natural Gas (NG) must be connected to
a governed meter.
Liquid Petroleum Gas (LPG) must be connected to a
regulator.
Installation and connection of the gas supply to the
boiler must be in accordance with BS6891.
Under no circumstance should be size of the gas
supply pipe be less than 22 mm.
The meter or regulator and pipe work to the meter
must be checked, preferably by the gas supplier.
This is to ensure that the equipment is in good
working order and can meet the gas flow and
pressure requirements, in addition to the demand
from any other appliance being served.
NOTICE: This is reduced to IP20 if the
following mechanical timers are fitted;
7 716 192 036 or 7 716 192 037 or the
FW100 controller 7 716 192 067.
Page view 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 71 72

Comments to this Manuals

No comments