Bosch Greenstar 12i Service Manual Page 20

  • Download
  • Add to my manuals
  • Print
  • Page
    / 72
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 19
PRE-INSTALLATION
6 720 644 743b (2011/08)
20
3.7 PLUMBING MANIFOLD
3.7.1 CONNECTIONS
Use the fittings supplied in the Hardware literature pack.
If the boiler pipes are to be run behind the appliance
ensure that the pipes pass through the slot in the
white cardboard guide. This is fitted to the frame.
For further ease of fitting, an optional Vertical Pre-
piping Assembly kit is available, comprising five
pre-formed copper pipes and an earth bonding strip.
Part number: 7 716 192 570.
To cover the pipe work under the boiler, down to the
counter top, an optional “Below boiler pipe cover”
can be used.
Part number: 7 716 192 608
Fig. 20 Pipe dimensions
Fig. 21 Plumbing manifold
WARNING: IF FITTING AN OPTIONAL
INTERNAL DIVERTER VALVE
B Refer to the “Greenstar Optional Integral
Diverter Valve” installation instructions.
Heating System 22mm compression fittings
Gas 22mm
Tab. 19
Further guidance on pipe routing can be
found printed on the boiler template
(supplied with the boiler).
12345
6720644743-25.1Wo
# Function
From left
case edge
Diameter
of pipe
1CH Flow 70 mm 22 mm
2Gas 200 mm 22 mm
3CH Return 330 mm 22 mm
4Condensate 35 mm 22 mm
5 Pressure Relief Valve 367 mm 15 mm
Tab. 20 Key to figures 20 & 21
1
2
3
4
5
1
2
3
6720644743-10.2Wo
Page view 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 ... 71 72

Comments to this Manuals

No comments