Bosch Greenstar 12i Service Manual Page 14

  • Download
  • Add to my manuals
  • Print
  • Page
    / 72
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 13
PRE-INSTALLATION
6 720 644 743b (2011/08)
14
EXISTING BUILDS: S AND Y PLAN SYSTEMS:
S PLAN LAYOUT
Fig. 6 Existing build - S Plan
Y PLAN LAYOUT
WITH EXTERNAL DIVERTER VALVE
Fig. 7 Existing build - Y Plan external diverter valve
OPTIONAL DIVERTER VALVE
This boiler is designed to operate on a sealed system
only. The boiler will require a second return pipe from
the water cylinder to the wall mounting frame and
terminate in 15mm copper pipe.
EXISTING BUILD - SYSTEM LAYOUT
WITH OPTIONAL INTERNAL DIVERTER VALVE
(NOT SUPPLIED WITH BOILER)
Fig. 8 Existing build - Internal diverter valve
NEW BUILD - TWO ZONED HEATING SYSTEM
The latest Part L1a regulation for new installations
require separate zone controls for the central heating.
Fig. 9 New build - System layout
NOTICE: The boiler is fitted with its own
internal bypass.
1 Diverter/Zone valve
2 Radiator valve (flow)
3 Lock shield valve (return)
4Bypass
Tab. 10
NOTICE:
B A drain cock should be fitted at the
lowest point of the heating circuit and
beneath the appliance.
3
2
1
4
M
M
6720644743-05.1Wo
3
2
1
M
6720644743-06.1Wo
Boiler flow
Cylinder return
Heating return
)
3
2
6720644743-07.1Wo
6720644743-42.1Wo
3
2
1
4
M
MM
Page view 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 71 72

Comments to this Manuals

No comments