Bosch Greenstar 12i Service Manual Page 16

  • Download
  • Add to my manuals
  • Print
  • Page
    / 72
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 15
PRE-INSTALLATION
6 720 644 743b (2011/08)
16
3.4.2 EXTERNAL CONNECTIONS
If no other discharge method is possible then the use of
an externally run condensate drainage pipe terminating
at a suitable foul water discharge point, or purpose-
designed soak away, may be considered. If this method
is chosen then the following measures should be
adopted:
B The external run be kept as short as possible and not
exceed three metres.
B The pipe should be run internally as far as possible
before going externally and the pipe diameter should
be increased to 32mm before it passes through the
wall to the exterior. The pipe should be insulated
using suitable waterproof and weather resistant
insulation.
B The external pipe should take the shortest and least
exposed route to the discharge point, and should
"fall" as steeply as possible away from the boiler, with
no horizontal runs in which condensate might stand.
B The use of fittings, elbows etc. should be kept to a
minimum and any internal “burrs” on cut pipe work
should be removed so that the internal pipe section is
as smooth as possible.
FITTING AN EXTERNAL AIR BREAK
Refer to figure 13 when a rain water down pipe is
used to dispose of condensate.
An air break must be installed in the 43mm pipe work,
between the boiler condensate outlet and the
drainpipe, outside the property, to avoid flooding
during adverse weather conditions.
Fig. 13 Disposal into a rainwater down pipe
Where the pipe terminates over an open drain or gully,
the pipe should terminate below the grating level, but
above water level, in order to minimise “wind chill” at
the open end.
The use of a drain cover (such as those used to prevent
blockage by leaves) may offer further protection from
wind chill.
Pipe drainage will be improved if the end is cut at 45 ° as
opposed to a straight cut.
Fig. 14 External disposal
NOTICE: Freezing conditions
B Pipe work length should be kept to a
minimum and the route as vertical as
possible.
B Weather proof insulation must be used.
NOTICE: Condensate waste
B Care should be taken when siting a soak-
away to avoid obstructing existing
services.
Continued - Key to condensate illustrations
8 PVCu strap on fitting
9 100mm Ø minimum plastic pipe
10 Drainage holes
11 Limestone chippings
12 Bottom of sealed tube
13 Insulate and increase pipe size
14 Pipe work transition
15 External air break
16 Air gap
17 External rain water pipe into foul water
18 43mm 90° male/female bend
* Condensate trap of 75mm already
incorporated into the boiler
Tab. 12
Condensate drainage pipe can be run above
or below ground.
18 8
13
14
17
15
16
1
6720644744-09.2Wo
*
25mm min.
14
13
1
6720644744-10.2Wo
*
Page view 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 71 72

Comments to this Manuals

No comments