Bosch Greenstar 12i Service Manual Page 15

  • Download
  • Add to my manuals
  • Print
  • Page
    / 72
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 14
PRE-INSTALLATION
6 720 644 743b (2011/08)
15
3.4 CONDENSATE PIPE WORK
3.4.1 INTERNAL CONNECTIONS
In order to minimise risk of freezing during prolonged
cold spells, the following methods of installing
condensate drainage pipe should be adopted, in order of
priority.
Wherever possible, the condensate drainage pipe should
be routed and terminated so that the condensate drains
away from the boiler under gravity to a suitable internal
foul water discharge point such as an internal soil and
vent stack. A suitable permanent connection to the foul
waste pipe should be used.
Fig. 10 Disposal to soil vent stack
Alternatively if the first option is not possible an internal
kitchen or bathroom waste pipe, washing machine
waste pipe etc. can be used.
Ensure that the condensate drain pipe is connected
“down stream” of the waste trap.
Fig. 11 Disposal to a waste pipe
CONDENSATE PUMP
Where “gravity discharge” to an internal termination is
not physically possible, or where very long internal runs
would be required to reach a suitable discharge point,
condensate should be removed using a proprietary
condensate pump, of a specification recommended by
the boiler or condensate pump manufacturer.
The pump outlet pipe should discharge to a suitable
internal foul water discharge point such as an internal
soil and vent stack, internal kitchen or bathroom waste
pipe, washing machine waste pipe etc. A suitable
permanent connection to the foul waste pipe should be
used.
Fig. 12 Condensate pump disposal
NOTICE:
B Where a new or replacement boiler is
being installed, access to an internal
“gravity discharge” point should be one
of the factors considered in determining
boiler location.
B The condensate pipe must be nominally
22mm Ø plastic pipe.
B The condensate pipe work must fall at
least 52mm per metre towards the outlet
and should take the shortest practicable
route.
B Ensure there are no blockages in the pipe
run.
Key to condensate illustrations
1 Condensate discharge from boiler
2 Soil and vent stack
3 Minimum 450mm and up to three storeys
4 Visible air break at plug hole
5 Sink or basin with integrated overflow
6 75mm sink waste trap
7 Condensate pump
* Condensate trap of 75mm already incorporated
into the boiler
Tab. 11
2
22mm Ø
1
3
6720644744-06.2Wo
*
100mm
75mm
min.
4
5
6
1
22mm Ø
6720644744-07.2Wo
*
75mm
min.
4
7
5
6
1
22mm Ø
6720644744-08.2Wo
*
Page view 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 71 72

Comments to this Manuals

No comments