COMMISSIONING
6 720 644 743b (2011/08)
39
5.5 COMMISSIONING
Having checked:
B That the boiler has been installed in accordance with
the installation instructions.
B The integrity of the flue system and flue seals, as
described in section 6.3 of this manual.
B The integrity of the boiler combustion circuit and
relevant seals.
5.5.1 CHECKING THE GAS INLET PRESSURE
The inlet pressure to the appliance must be checked
using the following procedure:
MEASURING THE INLET PRESSURE
Fig. 62 Inlet pressure test point
B Close gas isolation valve.
B Slacken the screw in the inlet pressure test point (1)
and connect a manometer.
B Open gas isolation valve.
B Measure the pressure with the boiler running at
maximum.
Press service button for more than ten seconds
and set Central Heating temperature to maximum.
The service button will illuminate continually and
the blue power indicator will pulse five times.
B Check the gas supply working pressure at the gas
valve conforms to values shown in Fig. 63 or Fig. 64.
GAS PRESSURE WITHIN THE SYSTEM
Refer to the figures below for natural gas or L.P.G gas
pressures.
The pressure at the boiler must not be less than the
pressure read at the meter minus:
1 mbar for Natural Gas
2.5 mbar for L.P.G.
The pressure drop from the meter to the gas valve must
not be more than:
2.5 mbar for Natural Gas
4 mbar for L.P.G.
If the pressure drops are greater than shown below,
then this would indicate a problem with the pipe work or
connections within the system.
Fig. 63 Natural gas pressures
Fig. 64 L.P.G. pressures
NOTICE: The combustion settings on this
gas-fired boiler have been checked, adjusted
and preset at the factory for operation on
the gas type defined on the data plate.
No measurement of the combustion values is
necessary provided there is a meter installed
allowing the gas rate to be checked.
DO NOT ADJUST THE AIR/GAS RATIO VALVE.
When running in the service mode, the boiler
will operate both the central heating and the
domestic hot water circuits. This is to allow
sufficient time for this part of the
commissioning procedure. It will be
necessary to run water through the domestic
hot water circuit to ensure that the boiler will
not cycle on low heating demands.
6720643895-53.1Wo
1
Ensure inlet pressure is satisfactory with all
other gas appliances working.
Equal to or less than .....
NOTICE:
Do not continue commissioning until the
correct gas pressure is achieved.
Meter
Boiler inlet
Gas Control
valve
19 - 23 mbar
18 - 22 mbar
16.5 - 20.5 mbar
1 mbar
drop
1.5 mbar
drop
Natural Gas
< 2.5mbar
difference
6720644744-44.2Wo
Gas Control
valve
L.P.G.
< 4.0mbar
difference
Regulator
Boiler inlet
32 - 45 mbar
29.5 - 42.5 mbar
28 - 41 mbar
2.5 mbar
drop
1.5 mbar
drop
6720644744-45.2Wo